Capabilities
What it takes to bring capacity online.
Six capabilities that move a project from an identified site to delivered data centre capacity.
- 01
Site Origination & Feasibility
Identifying land and existing industrial property, and testing each against zoning, connectivity, utilities, ground conditions and development timelines.
- 02
Power Planning & Expansion
Assessing grid capacity, coordinating with utilities on connection and expansion pathways, and planning phased power aligned with demand.
- 03
Greenfield & Brownfield Development
Developing new purpose-built facilities, or converting suitable industrial buildings where structure, power and location support data centre use.
- 04
Engineering & EPC Coordination
Defining the technical brief, appointing and coordinating design and EPC partners, and managing interfaces between electrical, mechanical and civil scopes.
- 05
High-Density & Liquid-Cooling Planning
Planning for high rack densities with air cooling, direct-to-chip liquid cooling or hybrid approaches, based on each customer’s workload and hardware.
- 06
Phased Construction & Delivery
Structuring delivery in phases so capacity can come online in step with power availability and customer ramp-up.
Project pathway
How a project moves forward.
- 01
Site Assessment
Location, land, structure and utilities reviewed.
- 02
Feasibility & Power Planning
Power pathway, capacity and phasing tested.
- 03
Design & Approvals
Technical design developed; permits pursued.
- 04
Construction
EPC delivery, coordinated by phase.
- 05
Commissioning & Handover
Systems tested and capacity handed over.
Each project’s actual scope and current stage differ. Inclusion of a stage in this pathway does not imply that any specific project has obtained approvals, secured a power commitment or reached completion.
Technical focus
Power, cooling and conversion.
Power pathways
Connection and expansion planned in phases, sized to customer demand.
Liquid-cooling readiness
Air, direct-to-chip and hybrid cooling options evaluated per project.
Brownfield conversion
Existing buildings assessed for structure, floor loading and power upgrade.
Illustrative concept — not a completed project
Engineering targets such as rack density, cooling approach, redundancy and availability are design objectives to be discussed. They depend on project design and are confirmed only in final agreements.